Ben Sawyer Bridge to close 5-7 a.m. Saturday for foundation repairs
SCDOT will close the Ben Sawyer Bridge early Saturday for ongoing foundation repairs, urging drivers to use alternate routes.
The South Carolina Department of Transportation (SCDOT) announced that the Ben Sawyer Bridge will be closed to vehicular traffic on Saturday, October 31, from 5 a.m. to 7 a.m. for continued repairs to the bridge's foundations, according to ABC News 4 WCIV and WCBD Count on 2.
This closure is part of ongoing efforts to fix mechanical issues that have caused the bridge to malfunction multiple times, including a previous problem with the main bridge span not locking back into place properly, WCIV reported.
Drivers are advised to seek alternate routes during the two-hour closure and to slow down and remain alert for crews working in and around the work zone, as stated by SCDOT officials.
- ABC News 4 WCIV: Ben Sawyer Bridge to close early Saturday morning as SCDOT continues repairs
- WCBD Count on 2: Ben Sawyer Bridge to close Saturday morning for 2 hours
Comments
No comments yet.
Sign in to comment